Jump to content

Trams in Samarkand

From Wikipedia, the free encyclopedia
Trams in Samarkand
Vario LF tram in Samarkand
Operation
LocaleSamarkand, Uzbekistan
Open29 March, 2017
StatusOperational
Lines2
Owner(s)Uzbek Railways
Infrastructure
Propulsion system(s)Electric
ElectrificationOverhead
StockPragoimex Vario LF
Statistics
Route length11.4 km (7 mi)
Stops26
Overview
Trams in Samarkand
Temir Yo'L Vokzali
Beruniy
Rudakiy
Yoshlik Bogi
Nurli Yo'L
Qozizoda Rumiy
Sayqali
Tramway depot
Choy Fabrikasi
Maqsud Shayxzoda
Bogisaroy
Buyuk Turon
Damarik
Chuqur Yo'L
Sogdiana Maskani
Istiqbol
Marxabo
Shifokorlar
Buyuk Ipak Yuli
Dahbet
Musiqa Maktabi
Afrosiyob
Sulim Yo'Li
Siyob Bozori
Turizm Kolleji
Huquqshunoslik Kolleji
Massiv Sartepa

The tram system of Samarkand, Uzbekistan, consists of two lines operated by Uzbek Railways, with a total of 26 stops and a length of 11.4 kilometers.

The modern, electrified system opened its first line in 2017, and is the first system to operate in Samarkand since the Soviet-era system was disestablished in 1973. Another two lines are planned for the future, for a total of four lines.

History

[edit]

The first trams in Samarkand began operation in 1924 and were powered by steam.[1]

In 1947, the tram system transitioned from steam to electric power. A fleet of 30 vehicles served the system until 1973, when it was dismantled.[1][2] The last of Samarkand's guided transport was disestablished in 2005, when the trolleybus system (operating from 1957) was removed.[1]

In 2016, Uzbek presidential candidate Shavkat Mirziyoyev promised for a new tram line to be constructed in Samarkand, and construction began upon his election.[3] Despite complaints from the local population over the effects of construction on traffic and the demolition of buildings to make way for the tram, the project finished on schedule. The first system line began operation in March of 2017, with Mirziyoyev as its first rider.[3][4]

The system's original stock of Pragoimex VarioLF trams were taken from Tashkent; its tram project had been abandoned the year before. Later, Samarkand purchased 42 of these trams directly from Czech company Pragoimex.[2][5][6]

A second tram line opened the following year, along with eight new trams.[1]

Current lines and future plans

[edit]

Samarkand is currently served by two tram lines. The system has an average headway of seven to nine minutes, and one journey from end to end takes about twenty minutes on each line.

Two more lines are in the planning phase; the four lines will total 34.8 km in length.[1][5]

References

[edit]
  1. ^ a b c d e Анохина, Елена (21 March 2018). "Вторая трамвайная линия открылась в Самарканде". TR.ru — Транспорт в России (in Russian). Retrieved 4 December 2023.
  2. ^ a b "Trams run in Samarkand". Railway Gazette International. 31 March 2017. Retrieved 4 December 2023.
  3. ^ a b "Трамвайную линию в Самарканде строит весь Узбекистан". Центр-1 / Centre1.com - Новости из Узбекистана (in Russian). Retrieved 4 December 2023.
  4. ^ "Trams start to run in Samarkand". UzDaily.uz. Retrieved 4 December 2023.
  5. ^ a b "Samarkand opens first tram line". railjournal.com. International Railway Journal. Retrieved 4 December 2023.
  6. ^ "Samarkand agreed with the Czech company on the purchase of trams". qazaqtimes.com. Retrieved 4 December 2023.

See also

[edit]